Colliers International Indonesia
  Description     Highlights     Services


Menara Prima

Jl. Lingkar Mega Kuningan
Blok 6.2, South Jakarta

Hand over date for fit-out works: July 2007

Estimated Completion: October 2007



Developer

PT. Wiratara Prima

Head Office

Menara Kadin, 26F
Jl. H. Rasuna Said X-5 Kav. 3
Jakarta, 12950
Indonesia
Phone    : 62(21) 527-4256
Fax        : 62(21) 527-4284



Sole Marketing Consultant

Colliers International Indonesia

Head Office

World Trade Center, 10F
Jl. Jend. Sudirman Kav. 29-31
Jakarta, 12920
Indonesia
Phone    : 62(21) 521-1400
Fax        : 62(21) 521-1411

Facility Management Office

Jl. Prapanca Raya No. 34
Jakarta, 12730
Indonesia
Phone    : 62(21) 7279-5156
Fax        : 62(21) 7279-5205

Description

Menara Prima is a 31 storey office building strategically located at Jl. Lingkar Mega Kuningan Blok 6.2, South Jakarta. Built on 7,319.27 sqm land site, this building has total Semi Gross Area of 36,641.62 sqm:

  • Office space 35,370.71 sqm
  • Retail space 1,270.91 sqm

With typical floor plate of approximately 1,300 sqm, Menara Prima has the Average Common Area factor of 11.6%. This building also has available Parking area for 520 cars, located in 3 basements and 3 parking structure with a ratio of 1:68 sqm and 548 m2 for motorcycle parking will be located in P1.

Highlights

  • Prime location within Mega Kuningan complex
  • Free in 3 in 1 zone
  • Self financing
  • Excellent access and good public transportation
  • Efficient floor plate
  • Sufficient building amenities
  • Independent electricity control and flexible air conditioner arrangement
  • Commitment to high quality building material
  • Proffesionalism of the owner and supporting team

Services

MECHANICAL AND ELECTRICAL

Air Conditioning

  • Fan Coil Unit : 10 zones per floor
  • Chillers : Carrier R134A from USA : No Freon, Ozone friendly
  • 4 chillers : 3 x 600 TR + 1x 300 TR

Electricity

  • PLN (4,300 KVA)
  • Generator Back Up 100%
  • (3 x 1,250 KVA, max. 8 sec. in transfer)

Lift (Schindler)

  • Low Zone (1-19) : 4 Units, 24 passengers, 150 mpm
  • High Zone (20-31) : 4 Units, 24 passengers, 240 mpm
  • Arcade Lift (B3-Arcade 2) : 1 Unit, 15 passengers, 96 mpm
  • Parking Lift (B3-GF) : 2 Units, 15 passengers, 96 mpm
  • Service Lift (all zone) : 1 Unit, 24 passengers, 150 mpm
  • Miconic10 System

Lighting

4 x 18 Watts (electronic ballast from Phillips)

TELECOMMUNICATION & SAFETY SERVICES

Telecommunication

  • Optical Fiber System will be available up to ???
  • Main Distribution Frame (MDF)
  • Hotspot in the podium floor

Telephone

  • Available on Junction Box every floor
  • 1000 lines up to 2000 lines

Internet Connection

Cable Vision on main line

Safety Services

  • Automation Fire Alarm
  • Sprinkler System
  • Smoke & Heat Detector
  • 2 units emergency stairs with pressuring fan
  • 2 units of Fire Hoses & Extinguishers on every floor
  • Fire door from Bostinco

Building Automation System

1200 points can be controlled from Control Room

SECURITY SERVICES

  • The latest international regulation on safety and security will be implemented as much as possible.
  • Building structure is designed to withstand earthquake up to 8.5 Richter scale.
  • 152 units of CCTV are available in every entrance, in the corridor and in the elevators.

TOILETS & WATER SERVICES

Toilets

  • Female Toilets : 3 toilets & 2 lavatories – TOTO and 1 wudhu
  • Male Toilets : 3 urinoirs (1 Moslem type), 2 toilets & 2 lavatories - TOTO and 1 wudhu
  • Executive Toilet : 1 toilet & 1 lavatory
  • Wall : Essenza
  • Floor : Essenza

Water

  • Main water supply from PDAM
  • 254 meter deep well
  • Sewage Treatment System (IPAL)

RETAIL/SUPPORTING FACILITIES

  • Banks & ATM machines
  • Restaurants, Café, Food Court
  • Mini market, Laundry, Florist
  • Wellness Center, Salon & Spa

Overview
Disclaimer Privacy Policy © 2014 Colliers International Property Consultants, Inc.